Structural Overhead Cranes Masterclass

When loads get too big for forklifts and too precise for rough handling, teams turn to overhead cranes. This practical guide takes you behind the scenes of a mega-project crane install. We’ll cover preparation and surveys—with the same checklists pro installers use.

What an Overhead/Bridge Crane Is

An overhead crane rides on parallel runways anchored to a building frame, carrying a trolley-mounted hoist for precise, vertical picks. The system delivers three axes of motion: long-travel along the runway.

They’re the backbone of heavy shops and assembly lines, from beam handling to turbine assembly.

Why they matter:

Controlled moves for large, expensive equipment.

Less manual handling, fewer delays.

Repeatable, precise positioning that reduces damage.

Support for pipelines, structural steel, and big machinery installs.

Scope at a Glance

Runways & rails: runway girders with crane rail and clips.

End trucks: wheel assemblies that ride the rail.

Bridge girder(s): cambered and pre-wired.

Trolley & hoist: reeving, hook block, upper limit switches.

Electrics & controls: power supply, festoon or conductor bars.

Stops, bumpers & safety: end stops, buffers, travel limits.

Depending on capacity and span, the crane might be a single-girder 10-ton unit or a massive double-girder 100-ton system. The installation flow stays similar, but the scale, lift plans, and checks grow with the tonnage.

Pre-Install Prep

Good installs start on paper. Key steps:

Drawings & submittals: Freeze the GA and verify reactions with the structural team.

Permits/JSAs: Permit-to-work, hot work, working at height, rigging plans.

Runway verification: Survey columns and runway beams for straightness, elevation, and span.

Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.

Staging dusty robotics & laydown: Mark crane components with ID tags.

People & roles: Brief everyone on radio calls and stop-work authority.

Millimeters at the runway become centimeters at full span. Spend time here.

Getting the Path Right

Runway alignment is the foundation. Targets and checks:

Straightness & elevation: Laser or total station to set rail height.

Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.

End stops & buffers: Install and torque per spec.

Conductor system: Mount conductor bars or festoon track parallel to the rail.

Log final numbers on the ITP sheet. Misalignment shows up as crab angle and hot gearboxes—don’t accept it.

Girder Erection & End Trucks

Rigging plan: Softeners protect painted flanges. Taglines for swing control.

Sequence:

Install end trucks at staging height to simplify bridge pick.

For double-girder cranes, lift both girders with a matched raise.

Land the bridge on the end trucks and pin/bolt per GA.

Verify camber and bridge square.

Prior to trolley install, bump-test long-travel motors with temporary power (under permit): confirm limit switch wiring. Re-apply LOTO once checks pass.

The Heart of the Lift

Trolley installation: Mount wheels, align wheel flanges, set side-clearances.

Hoist reeving: Lubricate wire rope; verify dead-end terminations.

Limits & load devices: Set upper/lower limit switches.

Cross-travel adjustment: Align trolley rails on a double-girder.

Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.

Grinding noises mean something’s off—stop and inspect. Don’t mask issues with higher VFD ramps.

Electrics & Controls

Power supply: Drop leads tagged and strain-relieved.

Drive setup: Enable S-curve profiles for precise positioning.

Interlocks & safety: E-stops, limit switches, anti-collision (if multiple cranes), horn, beacon.

Cable management: Secure junction boxes; label everything for maintenance.

Future you will too. If it isn’t documented, it didn’t happen—put it in the databook.

QA/QC & Documentation

Inspection Test Plan (ITP): Hold/witness points for rail alignment, torque, electrical polarity, limit settings.

Torque logs: Re-check after 24 hours if required.

Level & gauge reports: Note any corrective shims.

Motor rotation & phasing: Confirm brake lift timing.

Functional tests: Anti-collisions and zone interlocks.

A tidy databook speeds client acceptance.

Load Testing & Commissioning

Static load test: Apply test weights at the hook (usually 100–125% of rated capacity per spec).

Dynamic load test: Travel long-run, cross-travel, and hoist at rated speed with test load.

Operational checks: Emergency stop shuts down all motions.

Training & handover: Maintenance intervals for rope, brakes, and gearboxes.

When the logbook is clean, the crane is officially in service.

Where These Cranes Shine

Construction & steel erection: placing beams, trusses, and precast.

Oil & gas & power: moving heavy pumps, skids, and pipe spools.

Steel mills & foundries: hot metal handling (with the right duty class).

Warehousing & logistics: bulk material moves with minimal floor traffic.

Floor stays clear, production keeps flowing, and precision goes up.

Do It Safe or Don’t Do It

Rigging discipline: rated slings & shackles, correct angles, spreader bars for load geometry.

Lockout/Tagout: test before touch every time.

Fall protection & edges: approved anchor points, guardrails on platforms, toe boards.

Runway integrity: no cracked welds, correct bolt grades, proper grout.

Duty class selection: match crane class to cycles and loads.

Safety isn’t a stage—it's the whole show.

If It Doesn’t Run Smooth

Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.

Hot gearboxes: adjust brake air gap and reduce VFD decel.

Rope drum spooling: check fleet angle and sheave alignment.

Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.

Wheel wear & rail pitting: add rail sweeps and check clip torque.

Little noises are messages—listen early.

Fast Facts

Overhead vs. gantry? Bridge cranes ride fixed runways; gantries walk on the floor.

Single vs. double girder? Singles are lighter and cheaper; doubles carry heavier loads and give more hook height.

How long does install take? Scope, bay readiness, and tonnage rule the schedule.

What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.

Why Watch/Read This

Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll see how small alignment wins become big reliability wins.

Want ready-to-use checklists for runway surveys, torque logs, and load-test plans?

Download your pro bundle and cut hours from setup while boosting safety and QA/QC. Save it to your site tablet for quick reference.

...